分析不锈钢浮雕骨架的制作程序
作者:管理员    发布于:2015-08-22 10:09:51    文字:【】【】【
摘要:根据浮雕模型按比例核算到所需高度,浮雕内骨架的选用的刚才和管材的型号直径是不同的,不锈钢浮雕的主体的框架是由粗变细、由密而疏焊成方笼。

    根据浮雕模型按比例核算到所需高度,浮雕内骨架的选用的刚才和管材的型号直径是不同的,不锈钢浮雕的主体的框架是由粗变细、由密而疏焊成方笼。
    According to the scale of the relief model to calculate the required height, the selection of the internal skeleton of the selection of the model is different from the pipe diameter is different, the main body of the main body of the stainless steel relief, from the dense and sparse welded into a square cage.


    各个管材、钢材之间的使用焊接连接的,焊接前,除检查切口平整度外,对管壁厚度大于或等于4㎜的管子,应对管端加工V型坡口,管子坡口应按规定留有坡口间隙。所有承重骨架采用双面满焊,整体骨架完成后用防锈漆满涂三遍。
    Between each pipe, steel welding connection, before welding, in addition to check the smooth incision givers and the tube wall thickness is greater than or equal to 4 mm tube, deal with pipe end machining V-shaped groove, groove of the pipe should be required to leave a gap groove. All load bearing frame with double side welding, the whole skeleton is finished with anti rust paint over three times.


    不锈钢浮雕在副支架结构设计时,常取单块铜壁板作分离体,壁板上铸有支耳,使其与副支架的一端相连,杆的另一端则连接到主支架上。
    Stainless steel relief in the sub frame structure design, often take a single piece of copper plate for the separation, the board has a supporting ear, so that it is connected with the side bracket, the other end is connected to the main bracket.


    为了达到副支架能将铜壁板上的载荷传递到主支架上,对铜壁板上支耳的数目、位置、副支架与主支架连接所形成的空间夹角等应以它们能组成一个超静定结构为准。
    In order to achieve the load transfer to the main bracket on the copper plate, the number, position, the position of the supporting ear, the position of the bracket and the space angle formed by the connection between the main support and the other side of the copper plate, the space angle formed by the connection between the copper plate and the main bracket.


    为提高结构的安全性,对统计出的实际重量、风速还得加一个放大系楼再用于主、副支架的设计。主支架的外廓形状和尺寸的设计,用1:5中样模型来测取,从底平面开始,取垂直Z轴的横截面与浮雕外廓交线的一线点,量取其平面坐标值。取点数的多少,应以能准确绘制出此截面上一整圈外廓形状的曲线为准。
    In order to improve the safety of the structure, the actual weight, wind speed and wind speed have to be used in the design of the main and auxiliary support. Contour shape and size of the main bracket design, with 1:5 model to test, from the bottom level began to, take vertical Z axis of the cross section and relief contour intersection point line, a measurement the plane coordinate values. How many points should be taken, can accurately draw the cross section of a circle contour curve is.


    不锈钢浮雕的主支架承受的主要载荷,稳态风载。在选定风速下,一般考虑正面、侧面、背面、等四个方面作用在雕像身上的各方向风力。
    Main load, steady wind load of the main frame of stainless steel. Under the selected wind speed, generally considered the front, the side, the back, and so on four aspects function on the statue body each direction wind.

 

关注公众平台

联系我们
 公司地址:中国。郑州

 咨询电话:15978409299

 微  信:15978409299

 咨询 QQ:2764182758

 官方网站:

 http://www.jinlancao.com

 微信平台:jinlancaobihua

 博  客:

 http://blog.sina.com.cn/jinlancao

 公司地址:中国。郑州市区

 高新区企业公园E座502室

 工厂地址:郑州中国。郑州市 科学大道与淮阳路交汇北500米路东。

(来厂提前预约)

脚注信息
版权所有:河南金兰园林景观工程有限公司;   咨询预约热线:0371--56759299,手机(微信):15978409299,官方网址:http://www.diao-su.net


 Copyright(C)2009-2015  豫ICP备17008189号-4